Support grid stability and earn 19% per year from battery energy storage
Volt builds battery storage only, with no solar or wind assets. Each site earns on three segments of the energy market at once, not tied to its own generation. The market is just forming: this is the moment to enter at the start.
An asset that serves the grid, not its own generation
Storage buys electricity when it is cheap and sells it when it is expensive, regardless of who produced it or how. This sets Volt apart from projects where storage is tied to a specific solar or wind plant: our asset does not depend on the weather or a single generation point.
The asset class is already proven by the market. The first storage cooperatives in Ukraine reached commercial operation in 2026 and confirmed the projected returns in practice. Volt follows the same model: a separate legal entity for each site and associate membership of the investor in the cooperative.
Current investment offer
Power Hub 2 is Volt's second site and the first open to investors. The first, Power Hub 1, is already under construction with our own funds.
Advantages
What lowers the risk and drives the return of every Volt site.
Superior returns at the start of the market
Demand for balancing capacity is growing faster than storage supply in Ukraine; early entry means a better price per MWh.
Market-linked revenue
Revenue is earned in hryvnia, while balancing capacity prices track the European energy market.
AlphaESS equipment with a 10-year warranty
Liquid-cooled containers with LFP batteries. Part of the equipment is already in Europe.
First site built with our own funds
Volt is building Power Hub 1 (0.9 MW / 1.9 MWh) with its own funds, launching in Q3 2027. We back the model with our own money.
Operated by D.Trading
We plan to hand site operation to market leader D.Trading: 24/7 monitoring, trading on DAM, IDM and BM, reporting. Their commercial offer is already received.
Transparent ownership
The investor becomes an associate member of the cooperative with a share in its assets, protected by the Law of Ukraine on Cooperation.
Volt project pipeline
We are already building the first site with our own funds and raising capital for Power Hub 2. Each investment site is a separate cooperative with its own fund.
Power Hub 1
Power Hub 2
Power Hub 3
Power Hub 4
How storage earns: three markets at once
One and the same site takes part in three segments of Ukraine's energy market within a single day. That is the source of the return, not a single "buy low, sell high" trade.
The core daily cycle: the site buys tomorrow's volume on a known hourly price schedule and sells it in peak demand hours. This is the basis of the charge/discharge schedule.
Targeted trades during the day when generation or demand forecasts shift. The site buys or sells volume closer to real time, hedging its day-ahead position.
The site holds reserve capacity and responds to Ukrenergo's signal within seconds to minutes, keeping grid frequency at 50 Hz. The fastest and usually the highest-value segment per MW.
Equipment and operation
A market-leading contractor is selected for construction, and the Volt team has a background in installation. Equipment is an AlphaESS containerised solution, and we plan to hand operation to D.Trading.
AlphaESS containerised solution
An international energy storage manufacturer founded in 2012: over 1,500 employees in 15 locations worldwide, 200+ patents.
Market leader D.Trading
We plan to hand operation of Power Hub 2 to D.Trading, one of the leaders in energy trading. Their commercial offer is already received.
What Power Hub 2 will look like
Illustrative layout · final layout per detailed designFinancial terms
One set of terms for every site in the Volt portfolio, including future phases.
Calculate your income
Projection at 19% per year over a 10-year horizon. Paid quarterly.
Power Hub 2 cooperative roadmap
From cooperative registration to the first investor payout.
Registration of the Power Hub 2 cooperative
Set up under the Law of Ukraine on Cooperation; Volt joins with a founding share.
Fundraising opens
Funding target: $3,000,000. Minimum contribution: $50,000.
Fundraising closes, grid connection agreed
Investor list finalised, grid connection terms from the regional operator.
Equipment delivery and installation
Delivery of AlphaESS containers, power equipment and control system; construction and installation on site.
Commissioning
Load testing, charge/discharge modes and response speed checks for the BM.
Grid connection
Site certification and access to DAM, IDM and BM via Ukrenergo.
Commercial operation starts
Power Hub 2 starts trading on three market segments.
First quarterly investor payout
Profit distribution for the site's first commercial period.
FAQ
What every investor wants to know: will I really earn?
Will I really earn?
The model is built on actual data from our sites: over UAH 11 per kWh of capacity per day. Operation by market leader D.Trading.
What if revenue is lower?
The management company receives 35% of profit only: we earn only when you do. Plus a 50% residual asset value.
Can I invest as a non-resident, for example from Switzerland?
Yes, through associate membership in the cooperative.
How are payouts made?
Quarterly, for 10 years.
How is my income taxed?
According to the laws of your country of tax residence.
How do I know the site is performing?
Quarterly reporting: energy volumes, revenue, downtime and key metrics.